The Surat Metro Rail Project is a transformative public transport initiative that will redefine mobility within Surat, a major industrial and commercial hub of Gujarat. The system comprises two corridors spanning 40.35 km with 38 stations, connecting key residential, industrial, and business zones.
Commenced in January 2021, the project is being implemented by GMRC to support sustainable urban growth and provide a fast, eco-friendly mode of mass transit for millions of residents.
- Provides modern rapid transit for a fast-growing industrial city.
- Improves connectivity between residential, commercial, and industrial zones.
- Reduces vehicular congestion and carbon emissions, supporting green urban mobility.
- Strengthens Surat’s infrastructure as a key economic and export hub of India.
Ameenji Rubber Limited has been commissioned for the design, manufacturing, in-house testing, and supply of critical bridge and viaduct components, including:
- Elastomeric Bearings
- POT /PTFE Bearings
- Omega Seal Expansion Joints
These systems enhance the longevity, load capacity, and structural stability of elevated metro sections through precision engineering and rigorous testing standards.
Why Ameenji Was Chosen
- Proven Performance: Track record across multiple Indian metro projects for on-time delivery and quality compliance.
- Production Capability: High-capacity press machines to meet bulk and deadline-driven requirements.
- In-House Testing Expertise: NABL-accredited laboratory meeting ISO/IEC 17025 standards.
Technical Knowledge: Deep understanding of GEC and design consultant requirements as per IRC, EN, and AASHTO LRFD 2012 specifications.
| Corridor 1 | Sarthana – Dream City (21.61 km; includes ~6.47 km underground section) |
| Corridor 2 | Bhesan – Saroli (18.74 km; primarily elevated) |
| Total Length |
40.35 km |
| Stations | 38 (total) |
| Depots | Two (one per corridor) |
| Rolling Stock | 72 state-of-the-art metro cars with advanced safety and energy features |
| Objective | Provide safe, reliable, and sustainable public transport while reducing road traffic by over 50%. |
| Implementing Agency | Gujarat Metro Rail Corporation Limited (GMRC) |
- Civil works progressing on both corridors, with multiple viaduct and pier sections completed.
- Underground tunnelling between Kapodra and Dream City in advanced stages.
- Track laying and station construction underway on several elevated stretches.
- Rolling stock manufacturing in progress; first train delivery expected in 2025.